Pick a crate of lager, shandy or cider and we will knock 50% off a box of crisps. Take the crate
Idea 68

Our suppliers, your label, and the reasons we usually say no.

It is the most frequently requested commercial arrangement on this estate and the one we decline most often. This page explains what it would involve, what it costs, and why the answer to about four out of five enquiries is no.

The proposition

What white label actually means here.

A producer inside the sixteen-mile radius makes a product to your recipe and your specification, and it goes out under your name with no reference to this estate anywhere on it.

That is genuinely useful for a hotel that wants its own marmalade, a farm shop two counties away that wants a chutney it cannot make, or a pub group that wants a sausage to its own spec. It is ordinary manufacturing and there is nothing clever about it.

The complication is that the producers here are small. A hotel group wanting eight thousand jars is asking a two-person kitchen to spend eleven weeks on somebody else’s label, during which the shop it actually supplies has empty shelves.

Why we say no

The five tests an enquiry has to pass.

TestWhat we are checkingTypical failure
Does the producer want it? They are asked first, before we reply to you They are already at capacity, which is most of them
Does it displace the shop? Whether the run empties our own shelves A run of any size in October or November
Is the volume real? A firm first order, not a forecast Eight thousand units becomes eleven hundred
Is it honest on the label? Origin and method claims that survive clause two Somebody wanting "artisan" on a 40,000-unit run
Would we be embarrassed? Whether the finished product would shame the maker A price point that forces a worse recipe
The specification

What a white-label run involves, if it passes.

Volume and time

Minimum first run
1,200 unitsBelow that the changeover costs more than the run
Typical lead time
10–16 weeksFrom signed spec, not from enquiry
Recipe development
4–8 weeks on topIf you are not bringing a finished recipe
Blackout period
September to DecemberThe shop takes the whole of the producer’s capacity

Money

Deposit
40% at spec sign-offWhich pays for the ingredients, not for us
Our fee
NoneWe introduce and we specify. The invoice is the producer’s
Artwork and labels
Yours entirelyIncluding the legal check on it, which is not optional
Minimum shelf life
9 months ambientChilled white label is not something we do at all

The label

Our name on it
NeverThat is brand licensing, and it is a different page
Producer named
Your choiceMost people do not, and the producers do not mind
Origin claims
Evidenced, or removedClause two of the standard applies whether you hold the mark or not
Allergen and nutrition
Your legal responsibilityWe will tell you if it looks wrong. We will not sign it off

Indicative figures for a demonstration build. Nothing here is a quotation and nothing on this site takes payment.

The honest bit

The argument against doing this at all.

  1. White label is the most reliable way to hollow out a small producer.

    It looks like growth. Volume goes up, the machine runs full, and the invoice is larger than any the producer has seen. Then the customer moves the contract to a cheaper co-packer in year three, and the producer has spent two years building capacity for a customer who has gone and losing the retail customers who left when the shelves emptied.

    This has happened to two producers we know within twenty miles of here. Both survived. Neither would do it again.

    The order that fills the factory is the order that empties the shop.

  2. So the producer decides, not us.

    Every enquiry goes to the maker before it gets an answer from us, with the volume, the timescale and an honest read of what it would displace. If they say no, the answer is no and we do not go back to them a second time.

    That costs this estate nothing, because we take no fee on white label. Which is precisely why we can afford to ask the question properly.

Idea 68

White label, at a glance.

Four in five declined

On capacity and displacement, not on price.

Producer decides

Before we reply to you at all.

No fee to us

The invoice is the producer’s, entirely.

Nothing Sept–Dec

The shop takes all of it.

The other kind of licensing.

Lending the name itself, which is a much larger and much more dangerous question.

Wondering

What people actually ask.

The two questions this page gets most, answered without a support ticket.

The cast page names every person and what they are actually responsible for, which is not always what the programme implies.

No. This is an unsolicited third-party demonstration build, not affiliated with or endorsed by any of the businesses it describes.

Next along the route

Brand licensing

Carry on
Basket Book the pub Plot a field Join the list Bother us

Snooping, briefly.

We use a small number of cookies to keep your basket upright and to work out which pages people actually read. We do not sell anything about you to anyone, because that would be a rotten way to behave.

Read the detail